o This project will fund the provision of additional airbridges to 7 No. Code F<br />

stands in Q6.<br />

• Terminal 3<br />

o Q6 Projects at Pier 5, 6 and 7 will include second / third airbridges on all new<br />

/ reconfigured stands illustrated on diagram in App A2.<br />

o This project will fund the provision of an additional airbridge to 1 No. Code E<br />

stands in Q6. Should the Pier 5 project be cancelled – a second airbridge will<br />

be required on a further 4 Code E stands.<br />

• Terminal 4<br />

o<br />

JX Stands Phase 2 project planned for Q6 goes ahead and includes funding<br />

for three airbridges. If not, additional bridges will need to be installed on<br />

the existing JW stands.<br />

• Terminal 5<br />

o This project allows for 3 No. additional airbridges on Code E stands on T5A –<br />

The inclusion of a Multi-choice apron to provide operational flexibility is likely<br />

to make the inclusion of additional airbridges difficult.<br />

o<br />

Operational Issues<br />

The Project assumes the ability to install a third airbridge on Code F stands at<br />

T5B. Due to the inclusion of “Head of Stand” baggage delivery in the<br />

original T5 project scope, the initial brief published by BA & BAA accepted<br />

that the third airbridge would not be possible – This will require further<br />

investigation.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

Commentary:<br />

Revenue /<br />

airbridge<br />

Op ex /<br />

airbridge<br />

per Annum:<br />

£ nil This project will not add to Jetty service levels or<br />

revenue in any significant way as airbridges are<br />

being added to current Jetty served stands.<br />

Estimated<br />

+£525 k<br />

at<br />

Maintenance cost - £10,500 / annum / airbridge<br />

Operating cost - £ tbc / annum / airbridge<br />

No. new airbridges to be provided resulting in an<br />

increase of £ (10,500 + tbc) x 22 = £ tbc per annum<br />

Impact on User Charges: Not included in CIP <strong>2009</strong> Publication<br />

Estimated Per Passenger Cost Impact: TBC<br />

Commentary:<br />

None.<br />

Note: Impact on User Charge is subject to a number of complex variables and regulatory decisions and therefore<br />

information is indicative only.<br />

Assumptions:<br />

The following points cover the significant operational assumptions related to this<br />

project;<br />

• Opex based on historic maintenance costs.<br />

Areas of Disagreement<br />

The following points cover any significant areas of disagreement between BAA and the<br />

Airline Community regarding this project.<br />

None<br />

Note: Any disagreement noted must be read in the context of the airline engagement status shown above.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 383