Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

London Underground T123 Station Enhancement<br />

6136 : PiccEx Station Works<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Including new lifts from platform to ticket hall.<br />

Station refurbishment.<br />

Previously known as “PiccEx Station Works” in CIP 2008<br />

<strong>Plan</strong> layout<br />

Objectives:<br />

BAA: • To increase the flow capacity of T123 London<br />

Underground station.<br />

• Provide usable reduced mobility access to platform level.<br />

Provide a more ambient environment<br />

Airline:<br />

As BAA’s<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> -<br />

Infrastructure<br />

Green<br />

Brief<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £16,600,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

March <strong>2009</strong> November 2011 July 2014 July 2013<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

Background<br />

As part of the delivery of T5, funds were allocated to London Underground for<br />

“remodelling the Terminal 123 Station”<br />

Inclusions<br />

• 2 x 16 person lifts from ticket hall to platform level to provide ‘step free access’<br />

and unlock capacity on the escalators – reducing accident rate.<br />

• A refurbishment of the station is already in plan by LU (using PPP funds).<br />

Remaining funds from the lift project will be used to enhance the refurbishment<br />

project to focus on ambience related items: wall tiling, lighting, new signage.<br />

Exclusions<br />

• Standard communications systems upgrade and ‘deep clean’ refurbishment –<br />

funded by LU.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 228