Header Information<br />

Project Name:<br />

Name on<br />

Schedule:<br />

Additional Jetties – FQ<br />

FQ04 : Additional Jetties – FQ<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

Provision of additional airbridge jetties in Q6<br />

Location plans for T2, 3, 4 & 5<br />

BAA objectives are to:<br />

• minimise connection times<br />

• maximise customer service by maximising Jetty service<br />

levels<br />

• minimise abortive project costs<br />

minimise airline operational costs<br />

Airline:<br />

As BAA’s<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Amber Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £41,500,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Decision:<br />

Start on<br />

Site:<br />

Completion on Site:<br />

TBC<br />

Refer to appendix C for programme information detail.<br />

Operational Use<br />

Commences:<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• Following consultation with the airlines a commitment was made to provide 2<br />

airbridges on all JW stands and 3 airbridges on all JX Stands at <strong>Heathrow</strong>, by the<br />

end of Q6.<br />

• This project commences in Q5 and provides funds for additional airbridges currently<br />

outside the scope (and cost plan) of planned development projects<br />

• This Project does not allow for additional provision of Pre-conditioned air or Fixed<br />

Electrical Ground Power.<br />

• Airbridge costs based on BAA Standard Product<br />

• Project Management<br />

o<br />

o<br />

Overall strategy to be agreed at the Infrastructure Stakeholder Board.<br />

Project Delivery will be managed by local project teams at T2, T3, T4 and T5<br />

consulting Terminal AOCs at a more detail level.<br />

It is assumed that the airbridges planned to be installed in Q5 are completed<br />

within the programme set.<br />

• Terminal 2<br />

o The T2A & T2B Projects scope includes provision of 2 airbridges on all Code<br />

E (JW) and Code F (JX) Stands.<br />

o T2 Phase 2 will provide all airbridges on T2A Phase 2 and T2C<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 382