Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

T4 Check-In Extension<br />

3831 : T4 Check-in Capacity<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Refurbish and extend T4 check-in<br />

High level layout plan<br />

Objectives:<br />

BAA: • Allow a multi-airline operation to operate from the<br />

terminal in support of airline relocations.<br />

• Enable Skyteam alliance co-location as the anchor alliance<br />

in T4.<br />

Airline: • As BAA’s<br />

• Reduce opex through alliance co-location<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> Projects Green Construction Decision<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £92,130,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

June 2006 October 2007 October <strong>2009</strong> Phased<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

The extension and refurbishment of the T4 Departures Check-In area is designed to:<br />

• Upgrade the passenger experience<br />

• Improve the first impression of T4<br />

• Refurbish the existing check-in area including – floors, ceilings, lighting, check in<br />

desks etc<br />

• Add through an extension 25 meters of additional depth to the check-in concourse<br />

• Add 33 new check-in desks<br />

• Incorporate 64 new ticket desks with back offices<br />

• Include 30 new CUSS units<br />

• Add 1400m2 of accommodation<br />

• Reconfigure the forecourt to include a new pedestrian plaza<br />

• BA will vacate T4 on the dates outlined in the Airlines Relocation Sequence V3.0<br />

• The baggage system refurbishment is completed to programme<br />

• Airlines move in to T4 as per the Airlines Relocation Sequence V3.0<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 130