Header Information<br />

Project Name:<br />

Name in<br />

Schedule:<br />

T3 New Northern Pier and Stands<br />

FQ29 : T3 New Northern Pier and Stands<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

The provision of a new (Code F) northern pier and stands to<br />

replace the time expired pier 4a.<br />

Indicative T3 apron layout image.<br />

Objectives:<br />

BAA: • Provide additional code F pier serviced stands on the<br />

western campus.<br />

• Improve passenger experience and ASQ/QSM scores.<br />

• Improved taxiway operation by creating a further element<br />

of a fully ‘toast racked’ western campus apron.<br />

• Maximise tenant accommodation and retail opportunities.<br />

Airline: • Improved service offer<br />

• Increased tenant accommodation<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Red Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

TBC<br />

Completion on Site:<br />

Operational Use<br />

Commences:<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• This pier forms the northern section of any future toast rack on layout of the<br />

western campus. (It is a northern replication of Pier 6).<br />

• New pier to be linked to the T3 main building and TTS system via a tunnel.<br />

• A requirement to re-provide D’albac house (Cleared <strong>Heathrow</strong> <strong>Airport</strong> Limited land<br />

available at zero project cost)<br />

• Project scope is inclusive of stands and equipment areas, and any requirement to<br />

clear these areas and or required associated / adjacent areas.<br />

• The project will be responsible for clearing the construction area and if necessary reproviding<br />

the following existing facilities:<br />

• Cooling & High pressure hot water infrastructure<br />

• D’albic House<br />

• Pier 4a and associated infrastructure<br />

• CFL Building<br />

• Building 139<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 343