Eastern Campus Phase 2 - Initial Review Programme<br />

2012<br />

2013 2014 2015 2016<br />

2017<br />

2018 2019<br />

Multiple Projects - Production Design<br />

T2A & Eastern Campus<br />

Phase 1 Operational<br />

Airline Decants From T1<br />

Enabling Works<br />

T1 Airline Decant Complete<br />

Phase 1 of New Baggage<br />

System in T2A Operational<br />

Baggage System Operational to T2B<br />

TTS Operational<br />

Demolitions & Site Clearance<br />

T2 A Phase 2 & T2 C Fully Operational<br />

Baggage & TTS Tunnels<br />

TTS Maintenance Base Structure<br />

Construct T2 A Phase 2<br />

TTS Installation Incld Operational Trials<br />

Construct Terminal Pier / Pier 4 Replacement<br />

Construct T2 C<br />

Construct Phase 2 MSCP<br />

Airfield Works<br />

Airfield Works<br />

Airside Road Tunnel & Control Post<br />

Infrastructure Services Upgrade<br />

Ref : Diagrammatic Summary of 10000-XX-TS-XXX-000131 R2 0.1 15 th December <strong>2009</strong><br />