Header Information<br />

Project Name: T3 Pier 7 Redevelopment Phase 1<br />

Name on FQ34 : T3 Pier 7 Redevelopment Phase 1<br />

Schedule:<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Reprovide pier 7 (built in the late 1960’s) with a “toast rack”<br />

satellite facility.<br />

T3 apron layout image<br />

Objectives:<br />

BAA: • Improve passenger experience and ASQ/QSM scores<br />

• Improved segregation solution to deliver opex efficiencies<br />

• Improved taxiway operation by removing cul-de-sac and<br />

creation of a through taxiway<br />

• Maximise CIP accommodation, other tenant<br />

accommodation and retail opportunities<br />

Airline: • Improved service offer<br />

• Improved tenant accommodation<br />

• Improved CIP Lounge opportunities<br />

• Commonality of product on the western apron<br />

• Similar operating processes for staff<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Amber Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

Completion on Site:<br />

TBC<br />

Refer to appendix C for programme information detail.<br />

Operational Use<br />

Commences:<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

TTS West will commence A.S.A.P in Q6 and will start on site before P7.<br />

Passenger access to and from the first open phases of the new Pier 7 will be via coach.<br />

Key features of the Satellite will be:<br />

• 300m long satellite, 36m wide.<br />

• Similar design and layout to T2B and T2C satellites<br />

• Pier service to 5xJX stands,1xD stand and 2xE stand<br />

• Ability to operate either closed or open gaterooms<br />

• Vertical segregation of departures / arrivals<br />

• Passenger connectivity via Track Transit System<br />

• Automated Baggage connectivity from T3 only<br />

• Removal of Romeo cul-de-sac and creation of a through Golf taxiway<br />

• A single level of ramp accommodation along the full length of the new pier<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 358