Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

Pier 5 Gateroom Enclosures<br />

8494 : Pier 5 Gateroom Enclosures<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

This project is required to enclose the open gaterooms on Pier<br />

5 Terminal 3 in order to facilitate both Transportation Security<br />

Administration (TSA) and Department for Transport (DfT)<br />

security requirements, and in turn enable the stands to be<br />

fully utilised.<br />

None<br />

Improved stand utilization in live with Mou’s<br />

Operational efficiencies through a reduction in Airline and<br />

BAA security staff.<br />

Aid intuitive passenger processes through a consistent<br />

gateroom boarding operation with the rest of Terminal 3.<br />

Airline:<br />

Mou stand preferences met.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions Green ???<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £3,300,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

MM/ YYYY 11/ 2008 02/<strong>2009</strong> 12/2008 (Functional<br />

use of Phase 1)<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• This project supports the Airline Relocations strategy and directly facilitates the<br />

revised Terminal 3 stand preferences (the oneworld Alliance airlines onto Pier 5 and<br />

Virgin onto Pier 7).<br />

• The outline scope includes:-<br />

Pier 5 Phase 1 Extension (Elbow)<br />

• The enclosure of the 3 gaterooms (330, 332 and 334) by way of a full height<br />

glazed partitioning system<br />

• Re-use of existing desks and introduction of an additional single premium<br />

boarding card desk in each of the 3 gaterooms<br />

• Reprovision of the late bag drop<br />

• Replacement of carpet with a conglomerate floor tile.<br />

Pier 5 Phase 2 Extension (end Pier 5)<br />

• The extension of the low level glazed partitions and interconnecting gates to<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 98

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!