Key features of the Pier will be:<br />

• Similar design and layout to Pier 6, T5B, T5C and T2b satellites<br />

• Pier serviced code F stands<br />

• Ability to operate either closed or open gaterooms<br />

• Vertical segregation of departures / arrivals<br />

• Passenger connectivity to the T3 Track Transit station<br />

• Code F stands – all MARSed, 3 airbridges per stand, 2 PCA units per stand.<br />

• The extension solution should protect for a future/current interfaces with:<br />

• a new pier 5<br />

• the new northern code F taxi ways<br />

• the west to east track transit system<br />

• T6 airside road tunnel<br />

• The design of this pier will draw on the experience of delivering and designing the<br />

existing Pier 6, Terminal 5 and Terminal 2a satellites.<br />

• Provide decant facilities to facilitate the later demolition of the existing CIP building<br />

adjacent to the old pier 7 connector.<br />

• The delivery of this project must successfully manage a delivery interface with:<br />

• the code F northern taxi way<br />

• the introduction of a west to east track transit system<br />

• the T6 airside road tunnel<br />

• Pier 5 reconfiguration<br />

• It is likely that the northern pier stands will be undertaken as a first stage of works<br />

to deliver the new pier. (It is possible that several years may separate the delivery of<br />

the stands and the new northern pier).<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

per Annum:<br />

Commentary:<br />

To be developed<br />

Impact on User Charges: Not included in CIP <strong>2009</strong> Publication<br />

Estimated Per Passenger Cost Impact:<br />

Commentary:<br />

None.<br />

Note: Impact on User Charge is subject to a number of complex variables and regulatory decisions and therefore<br />

information is indicative only.<br />

Assumptions:<br />

The following points cover the significant operational assumptions related to this<br />

project;<br />

None<br />

Areas of Disagreement<br />

The following points cover any significant areas of disagreement between BAA and the<br />

Airline Community regarding this project.<br />

None<br />

Note: Any disagreement noted must be read in the context of the airline engagement status shown above.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 344