Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

Additional Jetties – Q5<br />

7656 : Additional Jetty Provision<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

Provision of additional airbridge jetties in Q6<br />

Location plans for T2, 3, 4 and 5.<br />

• minimise connection times<br />

• maximise customer service by maximising pier service levels<br />

• minimise airline operational costs<br />

Airline:<br />

As BAA’s<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions Amber Options<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £4,900,000<br />

Prior to CCRS transfers - Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Decision:<br />

Start on<br />

Site:<br />

Completion on Site: Operational Use<br />

Commences:<br />

05 / 2008 08 / 2008 03 / 2013 01 / <strong>2009</strong><br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• Following consultation with the airline community in 2006/7 a commitment was<br />

made to provide 2 airbridges on all JW stands and 3 airbridges on all JX Stands at<br />

<strong>Heathrow</strong>, by the end of Q6.<br />

• A budget of £ 10.5 was allocated in Q5 to commence this project. The remaining<br />

funds will be allowed for in Q6.<br />

• This Project does not allow for additional provision of Pre-conditioned Air or Fixed<br />

Electrical Ground Power.<br />

• Airbridge costs based on BAA Standard Product and Framework<br />

• Project Management<br />

o Overall strategy to be agreed at the Infrastructure Stakeholder Programme<br />

Board. Project delivery will be managed by local project teams at T2, T3, T4<br />

and T5 consulting with Terminal AOCs at a more detail level regarding<br />

implementation.<br />

• Terminal 2<br />

o The T2A & T2B Projects scope include provision of 2 airbridges on all Code E<br />

(JW) and Code F (JX) Stands.<br />

o This project will fund the provision of additional airbridges to 6 No. Code F<br />

stands in Q5 and a further 5 No. in Q6.<br />

o T2 Phase 2 will allow for 3 airbridges on all Code F stands.<br />

• Terminal 3<br />

o Airbridge supplier can minimise operational impact of installing third jetty on<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 212