Appendix A: Overview: <strong>Plan</strong> Layout with key dates<br />

T5C TBM Launch Chamber<br />

from April 2008<br />

T3 WIB Shaft<br />

from June 2008<br />

T1 EIB Shaft<br />

from September 2008<br />

Open-face TBM Delivery<br />

Tunnel Drive Commences<br />

February <strong>2009</strong><br />

December 2008 T5–T3 Operational – August 2011<br />

Commence Baggage<br />

Installation<br />

January 2010<br />

T3–T1 Operational – March 2012<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 156