Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

Landside CTA Roads Redevelopment<br />

4369 : Landside CTA Redevt Strategy<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

Q5 landside road modifications in the CTA.<br />

None<br />

Improve the efficiency of the road system within, and leading<br />

to/from, the Central Terminal Area to enhance the surface<br />

access connectivity to the terminals and other points.<br />

Airline:<br />

As BAA’s<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Amber Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £19,300,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

06/<strong>2009</strong> TBC TBC TBC<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• Throughout Q5 and Q6 a requirement exists to redevelop the central terminal area.<br />

This sheet deals with the Q5 scope which is at a very early stage of development.<br />

• It is currently anticipated that the final solution for the CTA will include<br />

redevelopment of the road system within the CTA and potentially a new bus<br />

terminal with links to the Underground and <strong>Heathrow</strong> Express stations and<br />

walkways linking the terminals with the CTA.<br />

• Within Q5 the project will involve facilitating road access to the new T2 MSCP and<br />

carry out service diversions and relocations, building relocation and demolition as<br />

required. The project will review the CTA approach capacity (main tunnel<br />

refurbishment and the Concorde roundabout).<br />

• To be confirmed – the overall master plan is currently in progress. A high level or<br />

grade level forecourt for T2 fundamentally affects the road infrastructure servicing<br />

T2, MCSP2, Bus & Coach Station.<br />

• Interim / temporary road system will be required for the opening date of T2A<br />

• Includes all grade and elevated roads servicing the footprint of the T2 MSCP and<br />

forecourt<br />

• Development of new Public Transport Interchange (PTI) i.e. Bus & Coach Station and<br />

Rail / Tube access is post Q5<br />

• CTA Masterplan is agreed<br />

• Project is to enable opening of T2<br />

•<br />

Project will be complete for T2 opening<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 232