Header Information<br />

Project Name:<br />

Name on<br />

Schedule:<br />

Code F A&B Taxiways between E&K Taxiways<br />

FQ07 : Code F A&B Taxiways between E&K Taxiways<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

The re-alignment of the existing Northern Code E taxiways in<br />

a southerly direction by approx. 30 metres to enable Code F<br />

clearances on both taxiways from the northern runway.<br />

Indicative plan image<br />

Objectives:<br />

BAA: • Improve taxiway operations and reduce delays /<br />

congestion in response to the growth in Code F<br />

movements at LHR;<br />

• Improve airfield flexibility and functionality<br />

Airline: • Reduced taxiway delays and congestion.<br />

• Improved punctuality.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Red Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

Completion on Site:<br />

TBC<br />

Refer to appendix C for programme information detail.<br />

Operational Use<br />

Commences:<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• Works to provide the northern code F taxiway will not commence until 2018<br />

• The scope of this project is to undertake only the taxi way reconfiguration within the<br />

footprint of the existing taxiways and stands supporting pier 4a.<br />

• Works to demolish pier 4a and provide new Code E stands are within the scope of<br />

the new northern pier.<br />

• The delivery team must maintain operations on at least one of the existing dual<br />

taxiways routes throughout construction of the code F taxi ways.<br />

• The delivery team need to be aware / manage the interfaces with the following<br />

adjacent projects:<br />

• West to East track transit link<br />

• New Northern Pier & Stands<br />

• Terminal 6 Airside Road Tunnel<br />

• Pier 5 stand re-configuration<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 392