FQ41 : T5C Phase 3<br />

FQ42 : T5D and Stands<br />

Table 3: Possible Q6 and Q7 Projects – Western Campus Programme<br />

2.6.4 Baggage Programme<br />

A number of broad themes for Q6 and beyond exist for the baggage product at<br />

<strong>Heathrow</strong>. These are summarised as;<br />

• Western Campus (T3, 4 and 5) – Possible need for improvements to the arrivals<br />

baggage processes.<br />

• Eastern Campus – Phase 2 of the development of the area.<br />

• Campus Wide Compliance – Manual handling and security compliance changes to<br />

the existing systems.<br />

• Campus Wide IT – With IT systems for baggage tending towards short (circa 5 year)<br />

lifecycles a need for replacement with Q6 is probable.<br />

At this time HAL does not present any potential baggage projects for Q6 and beyond.<br />

2.6.5 Infrastructure Programme<br />

In line with the surface access principles outlined earlier HAL expects to propose the<br />

development of a Public Transport Interchange (PTI) in the Central Terminal Area during<br />

Q6.<br />

During early Q6 it will be necessary to resurface / refurbish the two existing runways<br />

(27L / 09R and 27R / 09L).<br />

As explained in 2.4.7, the works known as Clean Working and Friendly (CWF), have<br />

previously been centralised for CIP purposes. For Q5 they are part of the Infrastructure<br />

Programme. Beginning in Q6 HAL propose that these allowances for capitalised minor<br />

asset replacement and renewal works be split by asset type and placed within more<br />

relevant geographic programmes. The list below therefore only includes pan-airport<br />

asset types, with the terminal / geographically specific allowances being presented in the<br />

Eastern and Western Campus listings.<br />

2.6.5.1 List of Possible Infrastructure Programme Projects<br />

Temporary “BCT” No and Project Name<br />

FQ04 : Additional Jetties - FQ<br />

FQ05 : Carbon Reduction<br />

FQ06 : Cargo Tunnel Renovation<br />

FQ07 : Code F A&B Taxiways between E&K Taxiways<br />

FQ08 : CWF Airfield (Q6 & Q7)<br />

FQ09 : CWF Connections (Q6 & Q7)<br />

FQ10 : CWF Other Areas (Q6 & Q7)<br />

FQ11 : <strong>Heathrow</strong> TTS: Inter Existing Terminals<br />

FQ12 : Landside Roads Infrastructure and Systems<br />

FQ13 : Main CTA Tunnel Renovation<br />

FQ14 : Maintenance of Retail Income<br />

FQ15 : Overlay Runway - Northern<br />

FQ16 : Overlay Runway - Southern<br />

FQ17 : PCA (existing facilities) - FQ<br />

FQ18 : Security Projects<br />

FQ19 : Utilities Infrastructure Upgrade<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 17