9107 : LPI2 - Kier<br />

• BCT 7049 covers a wide range of small works. The budget provides an allowance<br />

within which sub-projects are allocated as needed. The AFC therefore matches CCB<br />

and no information on AFC is provided in the PDS appendix.<br />

3.5 Airline Relocations Programme<br />

3.5.1 Overview<br />

This programme exists to deliver the ancillary activities, (such as logistics, staff training<br />

and operational trials) that deliver the Airline Relocations Move Sequence. The move<br />

sequence is a key driver of the Q5 CIP delivery. The resource allocated to this<br />

programme provide the overarching support governance to the moves. Consultation<br />

and governance with the airline community is via the Airline Relocations Working Group<br />

which has been running since October 2006.<br />

The current move sequence is shown below.<br />

Note: Steps 4.1 and 4.2 have been completed since publication of the sequence.<br />

Figure 4: Airline Relocations Move Sequence 3.1<br />

3.5.2 List of Projects<br />

BCT Number and Project Name as shown in Schedules<br />

7966 : Operational Readiness<br />

7702 : Relocation of Airlines IT Operations<br />

Table 10: Q5 Projects – Airline Relocations Programme<br />

3.6 IT / Systems Programme<br />

3.6.1 Overview<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 23