Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

T3 Landside Departures Refurbishment<br />

8510 : Landside Departures 1 st Floor<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

The refurbishment of passenger facing areas in T3 Landside<br />

Departures:<br />

Ref. Drawings / Images: General arrangement plan.<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA: Improve the passenger experience through landside<br />

departures with an improved passenger flow to security<br />

Airline:<br />

search.<br />

Increase efficiency and experience of passengers going from<br />

check in through to security search.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions Green ???<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £5,200,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

10 / 2008 11 / <strong>2009</strong> 09 / 2010 09 / 2010<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• The project has a trigger date of 01 April 2011<br />

• It assumed that the majority of work will be done at night with minimal impact on<br />

the operation and retail<br />

Key scope items are:<br />

• New ceiling system (excluding south wing annexe)<br />

• Improved lighting<br />

• New wall linings<br />

• Upgraded way finding<br />

• Repair and polish existing terrazzo floor<br />

• Rationalisation of signs and plasma screens.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

per Annum:<br />

Commentary:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 101