Header Information<br />

Project Name:<br />

Name in<br />

Schedule:<br />

T3 IDL Reconfiguration<br />

FQ28 : T3 IDL Reconfiguration<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

Reconfigure T3 International departure lounge to expand<br />

retail and service offer.<br />

Indicative layout<br />

Improve passenger experience and ASQ/QSM performance<br />

within the following areas:<br />

• Seating availability<br />

• Congestion<br />

• Eating and drinking facilities<br />

• Way finding<br />

Protect and grow existing retail income<br />

Airline:<br />

As BAA’s<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Red Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

Completion on Site:<br />

TBC<br />

Refer to appendix C for programme information detail.<br />

Operational Use<br />

Commences:<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• Project only occurs if the main Terminal 3 baggage facility is relocated away from<br />

the main building, the void space that is created results in an opportunity to relocate<br />

security search and the landside departures function. This then allows the extension<br />

of the IDL into the areas vacated by the relocation of search and landside departure.<br />

• The extension of the IDL would allow the re-planning of the IDL, and the<br />

introduction of new passenger focussed facilities. (e.g.) additional seating, catering,<br />

toilet and circulation areas.<br />

• Vertical circulation from the new search facility into the IDL we require the New<br />

Check In / Search project to be implemented and the teams to work closely to<br />

ensure an effective interface.<br />

• The scope of the security search project will include the provision of vertical<br />

circulation from the new search area to the existing IDL and the resulting<br />

reconfiguration requirements.<br />

• The IDL scope of works would be inclusive of a full fit out of the additional new area<br />

and a reconfiguration of significant areas of the existing lounge.<br />

• Assume the following level of works within existing IDL areas:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 340