The Q5 CAA decision allowed for monies to be spent on PSDH related work. The nature<br />

of the current PSDH position is outlined in Appendix A: Project for the Sustainable<br />

Development of <strong>Heathrow</strong>.<br />

In addition consultation has been undertaken with the airline community with regard to<br />

the use of Q5 PSDH monies to actively safeguard for PSDH related development. The<br />

two areas of discussion have been around T2C and Eastern Maintenance Base<br />

safeguarding.<br />

Of these the significant elements for CIP <strong>2009</strong> are the safeguarding works in and<br />

around T2B to enable a future T2C to be built. Appendix K: PDS – Eastern Campus<br />

Phase 2 Enabling provides further details of the possible Q5 safeguarding funding<br />

requirements in respect of T2C.<br />

The current consultation on T2C safeguarding concluded in February <strong>2009</strong> with the<br />

following statement being made 19 by the airline community.<br />

“Airlines accept that the £2.8m for T2B substructure & tunnel design should be drawn<br />

down from the <strong>2009</strong>/10 PSDH expenditure.<br />

This approval of the £2.8m from PSDH expenditure in <strong>2009</strong>/10 should not be<br />

misinterpreted as approval from the airline community of the general use of PSDH<br />

funding for non-R3/T6 expenditure for the remainder of the quinquennium, either on<br />

T2C or other projects. As the priority, HAL must detail the anticipated Q5 expenditure<br />

necessary to ensure that R3/T6 is delivered at the earliest opportunity. The primary basis<br />

for the fund is to ensure a swift response to the Government’s go-ahead for Runway 3<br />

and submission of a planning application at the earliest possible date.<br />

Before any consideration/approval of the use of any remaining PSDH expenditure is<br />

given for other projects, HAL must demonstrate the requirement for alternative<br />

expenditure [egT2C]. Given the current economic climate, HAL must also engage with<br />

the airline community to ensure the correct balance between the requirement of other<br />

projects and the potential to return funding.<br />

The airline community will continue to discuss their interpretation of the PSDH funding<br />

agreement with BAA and CAA to ensure a fair and appropriate response to PSDH<br />

requirements. The airlines continue to maintain that they agreed to include PSDH<br />

funding in the Q5 settlement only on the basis that funds would be added to the CIP in<br />

the year after they were expended.”<br />

On the basis of this agreement change control paperwork (Refer to section 5.7) is being<br />

presented to formally transfer budgets.<br />

3.8.2 List of Projects<br />

BCT Number and Project Name as shown in Schedules<br />

R3T6 : PSDH Q5<br />

Table 13: Q5 Projects – PSDH<br />

19<br />

The text in purple was sent, by way of formal agreement to decisions taken in the PSDH<br />

Working Group on 12 th February <strong>2009</strong>, from David Stewart (IATA) on 22 nd February <strong>2009</strong> by<br />

email to HAL.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 25