Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

T3 Check In Zones B to G Upgrade<br />

7593 : T3 Zone B-G Upgrade<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description: The project is the refurbishment of T3 Check In Zones B to G.<br />

Ref. Drawings / Images: • T3 ground floor plan layout,<br />

(Refer to Appendix A)<br />

• Check In Visualisations<br />

Objectives:<br />

BAA: • Improve the passenger experience.<br />

• Provide capacity and airline accommodation for Airline<br />

Moves.<br />

Airline:<br />

As BAA’s<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions Green Delivery<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £16,500,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Decision:<br />

Start on<br />

Site:<br />

Completion on Site: Operational Use<br />

Commences:<br />

07/2008 10/<strong>2009</strong> 12/2008<br />

Phased handovers<br />

of Zones for<br />

operational use.<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

Key scope items are:<br />

• New raft ceiling and replace bulkheads<br />

• Improved lighting<br />

• New walls behind check in desks,<br />

• Reclad passenger area wall linings<br />

• Reclad front of check in desks<br />

• Reclad column casings<br />

• VCC cladding refinished<br />

• Upgraded way finding<br />

• New queue mazes in cul-de-sac areas<br />

• Replace hammerheads on zones F/G with CUSS / SSK<br />

• Local floor repair and polishing<br />

• New zone G entrance door<br />

• New IT communications rooms<br />

• New façade ticket desks<br />

• Back of house accommodation works for airline moves<br />

• Scope changes transferred from HAL minor projects<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 90