will draw on the experience of delivering and designing the Terminal 5 and Terminal<br />

2 satellites.<br />

• It is likely that the Pier 6 phase two stands will be undertaken as a first stage of<br />

works to deliver the extension of pier 6. (It is possible that several years may<br />

separate the delivery of the stands and the new satellite pier).<br />

• Code F stands – all MARSed, 3 air bridges per stand, 1 PCA units per stand.<br />

• The solution should protect for the future connection of the extension to a new pier<br />

5 configured to fit with a toast rack layout on the western apron.<br />

• This project is enabled by the construction of the new pier 7, economies maybe<br />

achieved by delivering both projects simultaneously.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

per Annum:<br />

Commentary:<br />

To be developed<br />

Impact on User Charges: Not included in CIP <strong>2009</strong> Publication<br />

Estimated Per Passenger Cost Impact:<br />

Commentary:<br />

None.<br />

Note: Impact on User Charge is subject to a number of complex variables and regulatory decisions and therefore<br />

information is indicative only.<br />

Assumptions:<br />

The following points cover the significant operational assumptions related to this<br />

project;<br />

None<br />

Areas of Disagreement<br />

The following points cover any significant areas of disagreement between BAA and the<br />

Airline Community regarding this project.<br />

None<br />

Note: Any disagreement noted must be read in the context of the airline engagement status shown above.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 353

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!