Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

T4 Airline Relocations<br />

6604 : T4 Airline Relocation<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Office, ramp and CIP accommodation refurbishment to enable<br />

Airline Relocations.<br />

Ref. Drawings / Images: General arrangement plans;<br />

(Refer to Appendix A)<br />

• Ground level<br />

• Mezzanine level<br />

• First floor<br />

• Second floor<br />

Objectives:<br />

BAA: • Enable Airline Relocations<br />

Airline:<br />

As BAA’s<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> Projects Amber Construction Decision<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £27,400,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

01/2007 10/2008 07/2010 Phased<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• The scope comprises the refurbishment and reconfiguration of office, ramp and CIP<br />

Lounge accommodation, creating an environment suitable for the airlines and<br />

handlers moving to Terminal 4 from elsewhere at <strong>Heathrow</strong>.<br />

In summary, the requirements are,<br />

• the creation of extra CIP lounges of circa 14,000sqft,<br />

• the reconfiguration and development of office accommodation including new space<br />

of between 10-20,000sqft<br />

• the reconfiguration and development of ramp accommodation<br />

• Areas are vacated by current tenants in line with an agreed set of dates, based upon<br />

the <strong>Heathrow</strong> Airline Moves sequence.<br />

• Where possible, the refurbishment of office and ramp accommodation will involve<br />

minimal alterations to existing M&E<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

Commentary:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 123