Project Name:<br />

Name in<br />

Schedule:<br />

T3 Baggage Hall Refurbishment<br />

8569 : T3 Baggage Hall Refit<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description: This refurbishment project focuses on uplifting the<br />

environment, integrating the new extension, and co-locating<br />

the baggage desks aligned with the available budget.<br />

Ref. Drawings / Images: Overview <strong>Plan</strong><br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA: • Improved passenger experience.<br />

Airline: • As BAA’s.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions Green Scheme Design<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £11,400,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

10/2007 09/<strong>2009</strong> 09/2010 Continuous<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

The refurbishment will provide a significantly enhanced passenger and user experience<br />

and will support the airline relocation programme and the relocation of oneworld to<br />

Terminal 3. This will be achieved by:<br />

i. Easing congestion whilst improving passenger way-finding and orientation;<br />

ii. Improving utilisation of space for passengers and airline support facilities;<br />

iii. Improving access and egress links;<br />

iv. Modernising the appearance consistent with the BAA design palette;<br />

v. Where appropriate, provision of high-quality lighting and surfaces to receive<br />

lighting.<br />

• HAL Minor Projects are refurbishing toilets and air-conditioning throughout to<br />

provide a complete and consistent refurbishment product<br />

• A refurbishment programme only<br />

• Finishes constrained to the HAL design palette and the standard desk product<br />

established in Terminal 5 to be utilised<br />

• Only passenger facing areas are to be refurbished<br />

• The facility must remain operational throughout construction<br />

Note: Assumptions stated here are to aid understanding and are not necessarily<br />

exhaustive.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 114