Header Information<br />

Project Name:<br />

Name in<br />

Schedule:<br />

T3 Pier 6 Extension and Stands<br />

FQ32 : T3 Pier 6 Extension and Stands<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Extension to Pier 6, to provide 3nr code F gaterooms and<br />

stands in place of 2nr code M stands. (Note interdependency<br />

with the new CIP development project BCT 4217)<br />

Indicative T3 apron layout<br />

Objectives:<br />

BAA: • Improve passenger experience and ASQ/QSM scores.<br />

• Improved taxiway operation by creating a further element<br />

of a fully ‘toast racked’ western campus apron.<br />

• Maximise tenant accommodation and retail opportunities.<br />

• Provide decant facilities to facilitate the later demolition of<br />

the existing CIP building adjacent to the old pier 7<br />

connector.<br />

Airline: • Improved service offer<br />

• Increased tenant accommodation<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Red Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Decision:<br />

Start on<br />

Site:<br />

Completion on Site: Operational Use<br />

Commences:<br />

MM/YYYY MM/YYYY MM/YYYY MM/YYYY<br />

TBC<br />

Refer to appendix C for programme information detail.<br />

The following points cover the significant delivery assumptions related to this project;<br />

Assumptions:<br />

Key features of the extension will be:<br />

• Similar design and layout to existing Pier 6<br />

• Ability to operate either closed or open gate rooms<br />

• Vertical segregation of departures / arrivals<br />

• Code F stands – all MARSed, 3 air bridges per stand, 1 PCA units per stand.<br />

• CIP Lounge space<br />

• Ramp level accommodation<br />

• Scope is inclusive of 3 additional air bridge to the existing pier 6.<br />

• Dual pre conditioned air provision is required on all MARSed stands.<br />

• No work to taxiways included within the scope of this project. (Taxi way scope is<br />

within Pier 7 replacement project scope)<br />

• The extension solution will seek to interface effectively with the existing pier 6 but<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 352