Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

Pier 7 Refurbishment<br />

8406 : Pier 7 Connector Refurb<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description: • Provide a passenger facing refurbishment solution which<br />

is comparable with the quality and design strategy found<br />

elsewhere in Terminal 3 on Piers 5 & 6.<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

None<br />

Objectives:<br />

BAA: • Provide a significantly enhanced passenger and user<br />

experience on Pier 7 and improve QSM scores.<br />

Airline: • Provide a facility equivalent to other such facilities at<br />

<strong>Heathrow</strong>.<br />

• Mou objectives delivered.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions Green ???<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £14,800,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

MM/ YYYY 08/ 2008 12/<strong>2009</strong> 12/<strong>2009</strong><br />

(Sequential<br />

Operational Use<br />

commences<br />

10/2008)<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• This project has been classed as a Trigger project with a completion date of 1 st<br />

September <strong>2009</strong>.<br />

The planned replacement of Pier 7 in Q6 has been taken into account when selecting<br />

the relevant finishes and design solutions for this refurbishment without compromising<br />

the main objective.<br />

The outline scope includes:-<br />

• New rubber hard flooring to walkway areas<br />

• New carpet to gaterooms<br />

• Refurbishment of walls and repainting of ceilings on the connector and pier<br />

walkways<br />

• Refurbishment of the walls in the gaterooms<br />

• New character timber wall panels to gateroom entrances with integrated LCD<br />

screens<br />

• Introduction of some additional internal and external glazing<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 95