Header Information<br />

Project Name:<br />

Name in<br />

Schedule:<br />

T3 CIP Lounge Development<br />

FQ27 : T3 CIP Lounge Development<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

This project is to provide replacement and additional CIP<br />

lounge capacity in T3.<br />

None<br />

Objectives:<br />

BAA: • Provide enhanced CIP space with in T3 to meet airline<br />

needs.<br />

• Maximise commercial revenue.<br />

Airline: • Deliver excellent premium product.<br />

• Maintain or increase overall till income.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Amber Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

TBC<br />

Completion on Site:<br />

Operational Use<br />

Commences:<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

Allows demolition of the CIP building located on the existing P7 connector. (Previously<br />

estimated as an area of 4,500 sqm)<br />

Specification of new CIP is equivalent to the new T4 CIP facility.<br />

This project creates allowances to be made for additional volume in pier 5, 6 or 7, plus<br />

increased foundations etc. (5400m2) to accommodate CIP facilities.<br />

(Note potential interdependency / connection to the New Pier 7, Pier 6 extension and<br />

Northern Pier projects)<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

per Annum:<br />

Commentary:<br />

To be developed<br />

Impact on User Charges: Not included in CIP <strong>2009</strong> Publication<br />

Estimated Per Passenger Cost Impact:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 338