Header Information<br />

Project Name:<br />

Name in<br />

Schedule:<br />

T3 Pier 6 to T2A Link<br />

FQ33 : T3 Pier 6 to T2A Link<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

Link from T3 Pier 6 to T2A.<br />

Indicative T3/T1 apron layout.<br />

Provide flexible CTA infrastructure between Western and<br />

Eastern aprons.<br />

Airline:<br />

As BAA’s<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Red Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

Completion on Site:<br />

TBC<br />

Refer to appendix C for programme information detail.<br />

Operational Use<br />

Commences:<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project<br />

The link will include;<br />

• Both arrivals and departures links between Pier 6 and Terminal 2A.<br />

• No Travelator’s within links<br />

• 3.5m width walkway<br />

• Vertical segregation of departures and arrivals (Segregated vertical circulation at T2A<br />

end of facility)<br />

• Associated jetty and stand access<br />

• Arrivals and departures route Travelator’s<br />

• A route round T2A cooling facility<br />

• The realignment of existing T2A air bridges (Westernmost stands).<br />

• The extension solution will seek to interface effectively with the existing pier 6 but<br />

will draw on the experience of delivering and designing the new Terminal 5 and<br />

Terminal 2A satellites.<br />

• The delivery of this link should aim to not result in any stand or gate closures within<br />

Pier 6 or T2A<br />

• It will be necessary to providing both arrivals and departures links between Pier 6<br />

and Terminal 2A.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 355