Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

T3 Immigration Hall Refurbishment<br />

8563 : Immigration Hall refurb<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

This refurbishment project is part of a £68M programme of<br />

expenditure to refurbish Terminal 3, partly driven through<br />

asset replacement, and partly through airline relocations. The<br />

aim is to brighten and lift the overall space in line with T5<br />

design standards, to improve passenger flow throughout, and<br />

to provide a facility that can support the UKBA in improving<br />

service standards. This will include but is not limited to:<br />

• replacement floor, wall, and ceiling finishes to all passenger<br />

facing areas<br />

• increased & flexible queuing maze with increased capacity<br />

• T5 standard staggered immigration desks<br />

• optimised way-finding & improved signage<br />

• reduced congestion in the ‘decision-zone’<br />

HAL Minor Projects are refurbishing toilets and airconditioning<br />

throughout to provide a complete and consistent<br />

refurbishment product<br />

General arrangement of Option C.<br />

The refurbishment will provide a significantly enhanced<br />

passenger and user experience and will support the airline<br />

relocation programme and the relocation of oneworld to<br />

Terminal 3. This will be achieved by:<br />

• Easing congestion whilst improving passenger way-finding<br />

and orientation;<br />

• Improving utilisation of space for passengers and airline<br />

support facilities;<br />

• Improving access and egress links;<br />

• Modernising the appearance consistent with the BAA<br />

design palette;<br />

• Where appropriate, provision of high-quality lighting and<br />

surfaces to receive lighting.<br />

Airline:<br />

Service quality equivalence.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> &Solutions Green Scheme Design<br />

Project Delivery<br />

Current Control budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £10,600,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief Start on Completion on Site: Operational Use<br />