Header Information<br />

Project Name: A380 Taxiways Around Pier 1<br />

Name in 2809 : A380 Taxiways around pier 1<br />

Schedule<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Removal of the 160 stands and the Eastern Apron<br />

Development has created a temporary shortfall in Terminal 3<br />

JW stands. This project will enable the airline relocations and<br />

partially address the shortfall by providing three 757 coaching<br />

stands and one remote JW stand, relocating the BA 757 fleet,<br />

and freeing up T3 JW stands for wide bodied aircraft.<br />

See Appendix A<br />

Objectives:<br />

BAA: This project will replace three medium stands with two 757<br />

remote stands. A remote JW stretch stand with MARS for<br />

two more 757-200s, and a further remote 757 stand. Thus<br />

three pier served stands are replaced with three remote stands<br />

able to accommodate the larger 757-200 aircraft.<br />

Airline: This project will allow stand planners to allocate the BA 757<br />

fleet to these stands freeing up the larger stands for widebodied<br />

aircraft<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions<br />

Manufacture & Assemble<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £9,400,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

17/03/2008 22/06/<strong>2009</strong> 01/2011<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

The phases of this project will be delivered on the following dates:<br />

Phase 10A<br />

<strong>Plan</strong>ned start on site: 22 nd June <strong>2009</strong> (Phase 10A)<br />

<strong>Plan</strong>ned finish on site: 19 th December <strong>2009</strong> (Phase 10A)<br />

Phase 10B<br />

<strong>Plan</strong>ned start on site: September 2010 (Phase 10B)<br />

<strong>Plan</strong>ned finish on site: January 2011 (Phase 10B)<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 195