Pier 6 stands to levels acceptable to the T3 Airline Community.<br />

• Terminal 4<br />

o Airbridge suppliers are able to meet timescales driven by the taxiway<br />

refurbishment project, taking the opportunity to install additional jetties<br />

during planned stand closures minimising operational disruption.<br />

• Terminal 5<br />

o This project assumes that a third jetty can be installed on stand 565 – this is<br />

to be verified by the T5 team. Based on earlier design studies, the T5 brief<br />

accepted that this would not be possible due to the need to accommodate<br />

the Piccadilly Line extension ventilation fans.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex Revenue (+) /<br />

Commentary:<br />

Cost Area: Cost (-) Impact<br />

per Annum:<br />

Revenue £ nil This project will not add to Jetty service levels or<br />

revenue in any significant way as airbridges are<br />

being added to current Jetty served stands.<br />

Op ex / Estimated at<br />

+£275 k<br />

Maintenance cost - £10,500 / annum / airbridge<br />

Operating cost - £ tbc / annum / airbridge<br />

20 No. new airbridges to be provided resulting in<br />

an increase of £ (10,500 + tbc) x 22 = £ tbc per<br />

annum<br />

Impact on User Charges: Not included in CIP <strong>2009</strong> Publication<br />

Estimated Per Passenger Cost Impact:<br />

Commentary:<br />

None.<br />

Note: Impact on User Charge is subject to a number of complex variables and regulatory decisions and therefore<br />

information is indicative only.<br />

Assumptions:<br />

The following points cover the significant operational assumptions related to this<br />

project;<br />

• Opex based on historic maintenance costs.<br />

Areas of Disagreement<br />

The following points cover any significant areas of disagreement between BAA and the<br />

Airline Community regarding this project.<br />

• Carriers currently operating A380 aircraft in T3 would like the third airbridge<br />

delivered as soon as possible, and ideally prior to Airline Relocations Step 4. With<br />

the on-going stand closure programme due to the Pier 7 refurbishment project, the<br />

T3 AOC will not accept further stand closures. The project has been challenged to<br />

develop a programme which minimises stand closure to acceptable levels.<br />

Note: Any disagreement noted must be read in the context of the airline engagement status shown above.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 213

Hooray! Your file is uploaded and ready to be published.

Saved successfully!