Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

Eastern Maintenance Base Redevelopment<br />

7718 : Eastern maint Base Redev<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

Airline:<br />

This project is to redevelop the Eastern Maintenance Base to<br />

align with Phase 1 of the Eastern Maintenance Base<br />

Masterplan. The full extent of the scope is to be determined,<br />

but will include as a minimum the diversion of East Church<br />

Road , associated service diversions and<br />

modifications/relocation of facilities effected by the alignment.<br />

Draft layout plan.<br />

Enable growth in the east through the efficient use land<br />

within the airport boundary at <strong>Heathrow</strong>.<br />

Enable future proposed maintenance & fleet operations and<br />

create opportunity for consolidation of operations.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions Green Options Development<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> budget (Constant Prices): £28,000,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

Aug 2008 Apr 2010 Mar 2013 Jul 2011<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• Divert East Church Road to create a site for the development of a twin bay A380<br />

hangar. Which, facilitates the demolition of Cathedral hangar and construction of<br />

the outer taxiways to create the site for the construction of T2C.<br />

• Agreement will be reached on the timing and implementation of the Restricted<br />

Zone.<br />

• Does not include Phase 2 scope.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

per Annum:<br />

Commentary:<br />

To be assessed through Options Development<br />

Impact on User Charges: Not included in CIP <strong>2009</strong> Publication<br />

Estimated Per Passenger Cost Impact:<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 237