16.10.2014 Views

Capital Investment Plan 2009 - Heathrow Airport

Capital Investment Plan 2009 - Heathrow Airport

Capital Investment Plan 2009 - Heathrow Airport

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5.4.1 Terminology............................................................................................ 39<br />

5.4.2 Price Bases and Inflation Indices .............................................................. 39<br />

5.4.3 Inflation Rate Data and Commentary ...................................................... 40<br />

5.4.4 Selection of Construction Inflation Rate 2007/08 to 2008/09 .................. 40<br />

5.4.5 Construction Inflation Outlook and Resultant Action............................... 41<br />

5.5 Control Totals............................................................................................. 42<br />

5.6 Risk ............................................................................................................ 42<br />

5.7 Change Control.......................................................................................... 43<br />

6 Constructive Engagement ................................................................................... 46<br />

6.1 Q5 Delivery of Annex G Commitments........................................................ 46<br />

6.1.1 Main <strong>Capital</strong> Works including Stakeholder Programme Boards................ 46<br />

6.1.1.1 Stakeholder Programme Boards ...................................................... 46<br />

6.1.1.2 Consultation at Gateways ............................................................... 46<br />

6.1.1.3 Change Control .............................................................................. 46<br />

6.1.1.4 Consultation on Risk Allowances..................................................... 46<br />

6.1.2 Rail ......................................................................................................... 47<br />

6.1.3 Information Technology (IT) / Systems ..................................................... 47<br />

6.1.4 Project for the Sustainable Development of <strong>Heathrow</strong> (PSDH) ................. 48<br />

6.1.5 CIP Working Group................................................................................. 48<br />

6.1.6 Constructive Engagement Fora for <strong>Capital</strong> <strong>Investment</strong> ............................ 48<br />

6.2 Discussions on Future Developments (Q6 and beyond)................................ 49<br />

6.3 CIP Development Process............................................................................ 49<br />

6.4 Airline Engagement Status Marker.............................................................. 49<br />

6.5 Aspirations for Future CIP Publications ........................................................ 51<br />

Appendix A: Project for the Sustainable Development of <strong>Heathrow</strong><br />

Appendix B: Trigger Change Control<br />

Appendix C: PDS – Q5 Eastern Campus<br />

Appendix D: PDS – Q5 Western Campus<br />

Appendix E: PDS – Q5 Baggage<br />

Appendix F: PDS – Q5 Infrastructure<br />

Appendix G: PDS – Q5 Airline Relocations<br />

Appendix H: PDS – Q5 IT / Systems<br />

Appendix I: PDS – Q5 Rail<br />

Appendix J: PDS – Q5 PSDH, Thames Water and Support Adjustments<br />

Appendix K: PDS – Eastern Campus Phase 2 Enabling<br />

Appendix L: PDS – Q6 and Beyond Eastern Campus<br />

Appendix M: PDS – Q6 and Beyond Western Campus<br />

Appendix N: PDS – Q6 and Beyond Infrastructure<br />

Appendix O: PDS – Q6 and Beyond Rail<br />

Appendix P: Tracker CIP 2008 to CIP <strong>2009</strong><br />

Appendix Q: Cost Schedules<br />

Appendix R: Time Schedules<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!