• The requirement to remove above ground T5 TTS facility will be undertaken by<br />

another project.<br />

• HATTS maintenance base facility to be re-provided by another project.<br />

• The pier width is equivalent to T2B.<br />

• A replacement of the Fire station at ramp level and within the pier is within the<br />

scope of the T5D project.<br />

• A replacement of BA’s EAA facilities to an area of existing <strong>Heathrow</strong> <strong>Airport</strong> Limited<br />

land (zero project land cost) is within the scope of the T5D project.<br />

• The provision of a DCV link from T5C to T5D to pier 7 is within the scope of the T5D<br />

project.<br />

• Extended passenger connection tunnel from T5C to T5D is within the scope of the<br />

T5D project. (Specification as per the T5a to T5b passenger connection tunnel)<br />

• The satellite solution will draw on the experience of delivering and designing the<br />

new Terminal 5 and Terminal 2a satellites.<br />

• The new satellite will be linked to Terminal 5 via an extension to the existing track<br />

transit system.<br />

• The new satellite will be linked to Terminal 3 via the proposed track transit system<br />

extension.<br />

• It is likely that the T5D stands will be undertaken as a first stage of works to deliver a<br />

new T5D satellite pier. It is possible that several years may separate the delivery of<br />

the stands and the new satellite pier.<br />

• The new T5D satellite can only be constructed if the existing fuel facility has been<br />

relocated (COMA regulations).<br />

• Project to construct TTS station box, shell and core standard only. Full fit out to be<br />

delivered by the TTS project.<br />

• Code F stands – all MARSed, 3 airbridges per stand, 2 PCA units per stand.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

per Annum:<br />

Commentary:<br />

To be developed<br />

Impact on User Charges: Not included in CIP <strong>2009</strong> Publication<br />

Estimated Per Passenger Cost Impact:<br />

Commentary:<br />

None.<br />

Note: Impact on User Charge is subject to a number of complex variables and regulatory decisions and therefore<br />

information is indicative only.<br />

Assumptions:<br />

The following points cover the significant operational assumptions related to this<br />

project;<br />

• Increased levels of pier service will deliver increased operational efficiency and<br />

reduced airline operational expenditure.<br />

Areas of Disagreement<br />

The following points cover any significant areas of disagreement between BAA and the<br />

Airline Community regarding this project.<br />

None<br />

Note: Any disagreement noted must be read in the context of the airline engagement status shown above.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 379