16.10.2014 Views

Capital Investment Plan 2009 - Heathrow Airport

Capital Investment Plan 2009 - Heathrow Airport

Capital Investment Plan 2009 - Heathrow Airport

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Header Information<br />

Project Name:<br />

Name in<br />

Schedule:<br />

T3 Check-in and Central Search Relocation<br />

FQ26 : T3 Check-in and Central Search Relocation<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Remodel ground floor of T3 to accommodate revised check-in<br />

and central search facilities.<br />

Indicative impression only.<br />

Objectives:<br />

BAA: • Improve passenger experience (QSM/ASQ) in check in,<br />

security search and IDL areas<br />

• Increase capacity of the IDL<br />

• Deliver an enhanced search capability<br />

• Facilitate the adoption of the new search technologies<br />

• Derive business efficiencies as a result of the co- location<br />

of transfers and international search<br />

• Deliver a walk through check in routing directly into<br />

search process as per T5 & T2<br />

Airline:<br />

As BAA<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Red Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

TBC<br />

Completion on Site:<br />

Operational Use<br />

Commences:<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

Project only occurs if the main Terminal 3 baggage facility is relocated away from the<br />

main building, the void space that is created results in an opportunity to reconfigure<br />

check in and relocate security search.<br />

The project scope is:<br />

• Relocation of search from 1 st floor to ground floor; adoption of new search<br />

technologies and co-location of transfer and international search<br />

• New circulation from Search up into a reconfigured IDL;<br />

• Remodel check in – removal of cul-de-sac arrangement and creation of a linear,<br />

walk through check in set-up<br />

Note that there will be significant interface between IDL reconfiguration project and<br />

this project.<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 335

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!