Header Information<br />

Project Name:<br />

Name on<br />

Schedule:<br />

T4 Arrivals Reclaim for A380<br />

FQ38 : T4 Arrivals Reclaim for A380<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

The provision of a baggage hall capable of supporting the<br />

concurrent arrival of A380 aircraft.<br />

None<br />

BAA: Improved flexibility and service quality in T4.<br />

Airline:<br />

As BAA<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Red Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

Completion on Site:<br />

TBC<br />

Refer to appendix C for programme information detail.<br />

Operational Use<br />

Commences:<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

The scope shall include;<br />

• a small extension of the baggage hall (Within existing footprint)<br />

• the introduction of an additional 90m baggage belt<br />

• the fit out the incremental area and the interface between the existing and<br />

incremental area.<br />

• Need to undertake the demolition and reconfiguration of existing internal area<br />

required to provide 1 additional 90m A380 belts. The net impact will be that the<br />

baggage hall will contain 2 x 90m new baggage belts and 5 standard (std) existing<br />

baggage belts (Assumes that 1 x 90m A380 belt is delivered in Q5, reducing existing<br />

provision from 7 std baggage belts to 1 large and 5 std baggage belts).<br />

• Project scope is inclusive of the re-provision of any removed office space to areas<br />

within existing building. (Needs provision for strip out and BAA specification CAT A<br />

only).<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Operational Issues<br />

Financial Revenue and Operational Cost (Opex) Impact:<br />

Revenue / Opex<br />

Cost Area:<br />

Revenue (+) /<br />

Cost (-) Impact<br />

per Annum:<br />

Commentary:<br />

To be developed<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 366

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!