Possibilities are outlined in the Project Definition Sheets in Appendix M: PDS – Q6 and<br />

Beyond Western Campus.<br />

Q6 investment plans should consider the continued development of the infrastructure<br />

along those key themes;<br />

• On the Eastern campus, the completion of T2A and T2B will enable the majority of<br />

STAR airlines to “Move Under One Roof” and develop the STAR product offer at<br />

LHR. It will then enable the commencement of the Phase 2 development which will<br />

result in an extension of T2A to handle 30mppa and a new baggage system.<br />

Possibly complemented by a second satellite (T2C) on which consultation has<br />

commenced. Works will seek to create sufficient capacity to complete the colocation<br />

of STAR airlines at <strong>Heathrow</strong> and provide equivalence to Terminal 5<br />

(connections, terminal, baggage, airfield).<br />

• On the Western Campus, plans should consider British Airways’ desire to have an<br />

integrated hub operation. (A single connected campus including bringing the<br />

Terminal 3 building to Terminal 5 standards.)<br />

• Development options on both campuses are still being considered in terms of the<br />

need to balance demand across the airport in an affordable manner.<br />

There are no significant changes to the nature of Terminal 4 during the period of this<br />

CIP, other than the works already commenced to modify the check-in area and<br />

forecourt.<br />

2.4.2 Baggage<br />

The development of baggage functionality for <strong>Heathrow</strong> is a key element to the robust<br />

operation of the airport in general, and the hub / transfer process in particular. The<br />

production of infrastructure solutions for Q6 and beyond will need to ensure that the<br />

baggage product can provide Minimum Connect Times for transferring passengers that<br />

are at least comparable with those for the passengers themselves, and be comparative<br />

with the other global hubs.<br />

Such functionality shall need to address the needs of intra (within) and inter (between)<br />

terminal / campus connections with a view towards a consistent airport wide product<br />

standard. Works will also need to take account of any ongoing compliance changes<br />

arising from regulatory authority requirements in terms of security (E.g. DfT or TSA) or<br />

safety (E.g. HSE).<br />

Future development of the departure and arrivals baggage systems should focus on joint<br />

end to end process improvement between HAL and the airline / ground handling<br />

communities in order to improve key performance metrics such as; missed bags /<br />

thousand passengers, and arrivals delivery.<br />

2.4.3 Airfield<br />

Other then general modifications to the stand and taxiway arrangements to suit the<br />

“toast rack” principle outlined in 2.4.1 there are no significant changes proposed during<br />

this CIP period. Early work on the positioning, number and nature of “toast rack”<br />

satellites has highlighted a critical need for the number and configuration (dual versus<br />

single) taxiways in both the western and eastern airfield campuses. The following<br />

principles for development of the airfield have been agreed 14<br />

with the airline<br />

community;<br />

14<br />

Eastern Maintenance Base gateway sign off event held 18 th February <strong>2009</strong>.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!