Capital Investment Plan 2009 - Heathrow Airport

Capital Investment Plan 2009 - Heathrow Airport

Capital Investment Plan 2009 - Heathrow Airport

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8275 : T4 Victor Pier Refurbishment<br />

9028 : T4 Additional Transfer Security Lanes<br />

8274 : T4 Flooring<br />

Terminal 5<br />

T5C (See section 3.2.3)<br />

Table 7: Q5 Projects – Western Campus Programme<br />

3.2.3 Additional Explanatory Notes<br />

The following points are noted to provide additional clarity on some PDS and schedule<br />

information;<br />

• T5C PDS covers the following projects listed in the schedule;<br />

BCT Number and Project Name as shown in Schedules<br />

8335 : T5 Phase 2 Early Stands (Note: no AFC information provided in Appendix B of the<br />

PDS as work completed in 2008.)<br />

5221 : <strong>Heathrow</strong> Terminal T5C<br />

• BCT numbers 0002 and 9222 could be amended. (This applies to the BCT<br />

numbering only not the scope of the projects.)<br />

• BCT 3829 is only a budgetary provision. No work has commenced therefore no AFC<br />

information is provided in the appendix of the PDS.<br />

3.3 Baggage Programme<br />

3.3.1 Overview<br />

The main feature of the programme is the work to provide new or refurbished interterminal<br />

baggage connectivity.<br />

3.3.2 List of Projects<br />

BCT Number and Project Name as shown in Schedules<br />

7541 : T4 Post T5 Baggage Operation<br />

1851 : Post T5 Transfer Baggage System<br />

3798 : T4 Sorter Replacement<br />

3801 : T3 Integrated Baggage System<br />

3810 : System Baggage Cx refit T1 - T4<br />

4191 : Manual Handling Aids<br />

7969 : Terminal 4 Open Skies Baggage<br />

8747 : Baggage Integration<br />

8818 : Baggage Transition<br />

0615 : HBS VIVID replacement prog<br />

Table 8: Q5 Projects – Baggage Programme<br />

3.3.3 Additional Explanatory Notes<br />

The following points are noted to provide additional clarity on some PDS and schedule<br />

information;<br />

• BCT 7664 for T2A Ph2 Baggage System, listed in the cost schedule, allows for Q5<br />

funds linked to the Q6 and beyond PDS for Eastern Campus Phase 2. No PDS is<br />

provided as the scope will need to be determined based on the masterplan /<br />

prioritisation process outlined in section 2.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 21