Header Information<br />

Project Name:<br />

Name in<br />

Schedule<br />

HATTS Inter Terminal (existing airport)<br />

0000 : <strong>Heathrow</strong> TTS: Inter Existing Terminals<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Ref. Drawings / Images:<br />

(Refer to Appendix A)<br />

Objectives:<br />

BAA:<br />

Airline:<br />

This project contains 2 key elements of scope:<br />

• Twin track TTS system connecting T3 to T2A, enabling the<br />

East and West intra-TTS systems to be connected.<br />

• Twin track TTS system connecting T2C to T4, enabling T4<br />

to be connected to both the East and West systems.<br />

Overview plan layouts.<br />

1. Improved service offer<br />

2. Reduced passenger travel time<br />

3. Reduction in walking distances<br />

4. Improved ease of transfer<br />

5. Increased capacity for transfer traffic growth<br />

6. Supports <strong>Heathrow</strong> development plan<br />

1. Improved transfer product offer<br />

2. Enabler to grow transfer volumes<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

Strategy Green Pre-Outline<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices):<br />

Time:<br />

Brief<br />

Decision:<br />

£TBC<br />

Refer to appendix B for cost information detail.<br />

Start on<br />

Site:<br />

Completion on Site:<br />

TBC<br />

Refer to appendix C for programme information detail.<br />

Operational Use<br />

Commences:<br />

Assumptions:<br />

The following points cover the significant delivery assumptions related to this project;<br />

• This project is dependent upon the T5 system being extended to T3 by another<br />

project.<br />

• Assume station boxes for T3 and T2A are delivered by other projects;<br />

• Assume project is tunnel bored across the CTA;<br />

• Assume B139/D’Albiac House area is no longer required and vacant possession is<br />

achieved. Area is used as an entry point for TBM<br />

• Scope of works:<br />

• Additional Automated People Movers<br />

• Tunnel systems<br />

• Station box for T3<br />

• M&E fit out of tunnels<br />

• Safeguarded stub tunnels to a future T6<br />

• Assume a contingency passenger walkway is NOT delivered or required<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 401