Header Information<br />

Project Name:<br />

Name in<br />

Schedule:<br />

N1 Parking Deck<br />

7050 : N1 Car Parking Decking Project<br />

Project Overview, Objectives and Status<br />

Overview:<br />

Description:<br />

Following an initial study, the project to increase capacity at<br />

the N1 car park is no longer required as assumptions on<br />

which this requirement was based have since changed.<br />

Pending endorsement from the airline community, the<br />

remaining budget (spend to date: £136,706) associated with<br />

this project is to be reassigned to a number of priority<br />

landside infrastructure projects not previously identified in the<br />

Q5 CIP. These projects are likely to result from emerging<br />

Health and Safety Issues as well as the need to comply with<br />

legal commitments.<br />

Ref. Drawings / Images:<br />

They include:<br />

- CTA Main Tunnel<br />

- Fowles Yard<br />

- <strong>Heathrow</strong> Firemain<br />

- Passenger Trolley Issues<br />

None<br />

Objectives:<br />

BAA: • BAA objectives are to<br />

• Comply with legal commitments, legislative and<br />

regulatory requirements<br />

• Replace safety critical-infrastructure<br />

• Support operation to deliver targeted passenger service<br />

standards<br />

Airline: • Not yet consulted upon, but expected to be as BAA’s.<br />

Status:<br />

BAA Lead Team: Airline Engagement: Strategic Solution or DGS/IGS Stage<br />

<strong>Capital</strong> & Solutions Red Strategy<br />

Project Delivery<br />

Current Control Budget:<br />

Total <strong>Capital</strong> Budget (Constant Prices): £7,600,000<br />

Refer to appendix B for cost information detail.<br />

Time:<br />

Brief<br />

Start on Completion on Site:<br />

Operational Use<br />

Commences:<br />

Decision:<br />

Site:<br />

N/A N/A N/A N/A<br />

Refer to appendix C for programme information detail.<br />

Assumptions:<br />

None<br />

Note: Assumptions stated here are to aid understanding and are not necessarily exhaustive.<br />

Internal File Name: 0903XX-CIP <strong>2009</strong> Main Document-V71-IG 235