24.08.2013 Views

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Automobile Traffic<br />

Placing a routing decision of the Managed lanes type<br />

When defnining a routing decision of the managed lanes type, follow the<br />

outlined steps. Place<br />

► on the unmanaged part of the highway: a decision before each feeder<br />

from the unmanaged to the managed part of the highway which are in<br />

parallel. For each of these decisions, place the destination behind the<br />

nearest possible exit from the managed part towards the unmanaged<br />

part.<br />

► on the managed part of the highway: a decision before each feeder<br />

from the managed part of the highway to the unmanaged part of the<br />

highway. The destinations for each of these decisions place behind the<br />

nearest possible exit from the managed to the unmanaged part on the<br />

unmanaged part of the highway.<br />

When passing a routing decision of the type Managed lanes for the first<br />

time, a vehicle receives a random number indicating the probability for<br />

changing to the managed lane. The vehicle will use this random number for<br />

any other routing decision of the type Managed lanes. This way it can be<br />

guaranteed, that only in case of heavily changing traffic conditions the<br />

vehicle might change its initial decision.<br />

Two routing decisions of the managed lanes type should use the same<br />

Managed Lane Facility only if the following applies:<br />

► The courses of the unmanaged routes starting from these decisions are<br />

closed to identical.<br />

► The courses of the managed routes starting from these decisions are<br />

closed to identical, too.<br />

Graphical display of a routing decision of the Managed lanes type<br />

Via menu VIEW - NETWORK ELEMENTS open the Display of Network Elements<br />

window and<br />

► check option Routing decision and<br />

► select Managed Lanes Data in the Label column.<br />

Then, the network display on screen will show<br />

► the number of the decision of the Managed lanes type,<br />

► current travel time savings and speed on the managed lane and<br />

► the current road toll charged for user group 1 Person (SOV).<br />

Evaluations regarding routing decisions of the Managed lanes type<br />

Via menu EVALUATION - FILES you can check the Managed Lanes option to<br />

generate the evaluation file *.MLE (Managed Lanes Evaluation) during the<br />

next simulation run.<br />

6.4.5 Parking Lots<br />

Basically, the network element Parking lot is used for two completely<br />

different purposes:<br />

<strong>User</strong> <strong>Manual</strong> © PTV AG 2011 235

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!