24.08.2013 Views

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

11 Evaluation Types for Simulations of Vehicles<br />

Example (*.WGA file)<br />

Path Evaluation<br />

File:<br />

D:\Programme\PTV_Vision\<strong>VISSIM</strong>520\Examples\Training\DynamicAssignment\Detour\Detour.inp<br />

Comment: Dynamic Assignment routing example<br />

Date: Thursday, Oct. 22, 4:27:10 pm<br />

<strong>VISSIM</strong>: 5.20-00* [20623]<br />

TimeFrom: Time interval start<br />

TimeTo: Time interval end<br />

OrigP: Origin parking lot number<br />

OrigZ: Origin zone number<br />

DestP: Destination parking lot number<br />

DestZ: Destination zone number<br />

PathNo: Path number (see legend)<br />

Dist: Distance [ft]<br />

LinkCost: Total of all link cost on the path<br />

TotCost: Total Cost (using the vehicle type's coefficients) (Vehicle Type 1)<br />

TravTimeDiff: Percentage difference to travel time from previous iteration<br />

DetEdgeTT: Determined average total of edges’ travel times [s]<br />

ExpTravT: Expected average total of edges’ travel times [s]<br />

SmEdgeTT: Smoothed average total of edges’ travel times [s]<br />

DetPathTT: Determined average path travel time [s]<br />

ExpPathTT: Expected average travel time for the path [s]<br />

SmPathTT: Smoothed average path travel time [s]<br />

Volume: Number of vehicles started on the path (All Vehicle Types)<br />

RelVol: Share of the number of vehicles started on all paths for this OD relation (All<br />

Vehicle Types)<br />

Path 1, from parking lot 1, to parking lot 3, through node(s): 1 2 3 4<br />

Path 2, from parking lot 1, to parking lot 3, through node(s): 1 2 9 10 3 4<br />

Path 3, from parking lot 1, to parking lot 3, through node(s): 1 2 9 10 3 4<br />

Path 1, from parking lot 1, to parking lot 4, through node(s): 1 2 3 4<br />

Path 2, from parking lot 1, to parking lot 4, through node(s): 1 2 9 10 3 4<br />

Path 3, from parking lot 1, to parking lot 4, through node(s): 1 2 9 10 3 4<br />

Path 1, from parking lot 2, to parking lot 3, through node(s): 1 2 3 4<br />

Path 2, from parking lot 2, to parking lot 3, through node(s): 1 2 9 10 3 4<br />

…<br />

TimeFrom; TimeTo; OrigP; OrigZ; DestP; DestZ; PathNo; Dist; LinkCost; TotCost(1);<br />

TravTimeDiff; DetEdgeTT; ExpTravT; SmEdgeTT; DetPathTT; ExpPathTT; SmPathTT; Volume(0);<br />

RelVol(0);<br />

0.0; 300.0; 1; 1; 3; 3; 1; 3324.46; 0.00; 81.55;<br />

-1.89; 68.91; 81.55; 80.02; 70.82; 84.60; 81.84; 34;<br />

0.43;<br />

0.0; 300.0; 1; 1; 3; 3; 2; 4267.44; 0.00; 99.46;<br />

-2.90; 84.82; 99.46; 96.57; 88.07; 102.10; 99.29; 19;<br />

0.24;<br />

0.0; 300.0; 1; 1; 3; 3; 3; 3419.23; 0.00; 82.20;<br />

-2.35; 72.34; 82.20; 80.28; 74.64; 74.10; 74.21; 26;<br />

0.33;<br />

0.0; 300.0; 1; 1; 4; 4; 1; 3325.52; 0.00; 81.21;<br />

-1.98; 68.45; 81.21; 79.60; 64.77; 81.80; 78.39; 34;<br />

0.43;<br />

…<br />

564 <strong>VISSIM</strong> <strong>5.30</strong>-<strong>05</strong> © PTV AG 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!