6 The Traffic Network<br />

signal state at that time. Double-click calls the editing view for further<br />

changes.<br />

The editing view<br />

Signal group-based signal programs allow for modification of the individual<br />

signal groups and/or signal times. For graphical editing, the mouse can be<br />

used, alternatively, listed data can be edited. The display modes of list<br />

columns and signal states can be edited with the help of the context menu.<br />

Right-click calls the context menu which provides the following commands:<br />

● EXPORT (VISSIG add-on required):<br />

Graphical output of the signal program, cf.<br />

section 6.7.4.10.<br />

● APPEARANCE: For signal program display,<br />

the following options are provided:<br />

- CLASSICAL<br />

- 3D TUBES<br />

- 3D BOXES<br />

● RESIZE AUTOMATICALLY: In case of changes to the window size the data<br />

row size is adjusted automatically.<br />

● SHOW ENTIRE SIGNAL PROGRAM: Redraws the signal program and adjusts<br />

the data row size to the window size.<br />

● EDIT SIGNAL STATES: Select a row and hold left mouse-key down while<br />

moving the first or the last point of a signal state of variable duration. This<br />

editing mode you can also select in the symbol bar.<br />

● STRETCH/COMPRESS: Select a row and hold left mouse-key down in the<br />

time axis label section to stretch (move pointer to the left) or compress<br />

(move pointer to the right) the signal state display. This editing mode you<br />

can also select in the symbol bar.<br />

● EXTRACT INTERSTAGE (VISSIG add-on required, provided only for signal<br />

group-based signal programs): In the graphical display, you can cut out<br />

any interstage. If EXTRACT INTERSTAGE is selected, the cursor will appear<br />

as a cross in the tu column headers section. Hold left mouse-key down<br />

and mark the section you would like to extract. The selected interstage<br />

appears in the editing view, cf. section 6.7.4.7. This editing mode you<br />

can also select in the symbol bar.<br />

● SECOND GREEN TIME (provided only for signal groupbased<br />

signal programs): You can add another<br />

green time.<br />

318 <strong>VISSIM</strong> <strong>5.30</strong>-<strong>05</strong> © PTV AG 2011