24.08.2013 Views

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Test of Signal Control without Traffic Simulation<br />

detectors including call sequence and time gap can be defined for call and<br />

checkout using the following syntax:<br />

call : ANF {NACH DET }*<br />

checkout: ABM {NACH DET }*<br />

-- Configuration File for <strong>VISSIM</strong>/Test/Loop<br />

-- 185p98s4.SLF<br />

LSA 1 -- controller number<br />

VLZ 120 -- startup time (before preemption event)<br />

NLZ 240 -- recover time (after preemption event)<br />

BUM 5 -- number of analyzed cycles (if applicable - otherwise delete this line)<br />

ASL 1 -- number of nested loops<br />

ALF 7 -- total number of detectors with repeated demand (recall)<br />

LFD 1 2 3 4 5 6 8 -- detector numbers with repeated demand (recall)<br />

--<br />

SLF 1 -- Loop 1:<br />

VON 1 -- start of analysis time window<br />

BIS 10 -- end of analysis time window<br />

ANF 901 -- preemption call detector (actuated)<br />

ABM 902 -- checkout detector<br />

SGP 204 -- preemption (actuated) signal phase<br />

FZ1 53 -- travel time from call detector to stop line<br />

FZ2 3 -- travel time from stop line to checkout detector<br />

MRL 0 -- average queue length at stop line in vehicles<br />

Nesting of analysis loops is an option to analyze multiple combinations of<br />

events. However, this type of analysis requires a substantial amount of<br />

computing time.<br />

Overview of the Syntax<br />

Please note, that German and English commands can be used in the same<br />

file.<br />

German Definition English<br />

LSA Controller No. 1 SCJ<br />

VLZ Startup time (before preemption event) LDT<br />

NLZ (Optional) recover time (after preemption event):<br />

120 s<br />

CTI<br />

BUM Total number of analyzed cycles,<br />

(if applicable, otherwise delete this line)<br />

NCY<br />

ASL Total number of nested loops NLO<br />

AST Total number of detectors with continuous<br />

demand, followed by STE<br />

NCA<br />

STE Numbers of the detectors with continuous<br />

demand, only following AST<br />

CAC<br />

ALF Total number of detectors with repeated demand<br />

(recall), followed by LFD<br />

NRA<br />

<strong>User</strong> <strong>Manual</strong> © PTV AG 2011 461

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!