24.08.2013 Views

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3 Program Handling<br />

SIGNAL<br />

CONTROL<br />

VISUM<br />

Assignment<br />

Toll Pricing<br />

Calculation<br />

Models<br />

Managed Lanes<br />

Facilities<br />

Data input for Signal Control:<br />

Definition for managed lanes<br />

Definition for managed lanes<br />

Edit Controllers Create/Edit/Delete signal controllers,<br />

cf. section 6.7.3<br />

Communication Link/Unlink signal controllers,<br />

cf. section 6.7.6<br />

Optimize All<br />

Fixed Time<br />

Signal<br />

Controllers<br />

Starts the greentime optimization of all the<br />

stage-based fixed time controllers in the<br />

network, cf. section 6.7.3.11<br />

EVALUATION Select evaluation type(s) and set parameters:<br />

Windows Configuration of online evaluations, cf.<br />

chapter 10<br />

Files Configuration of off-line evaluations, cf.<br />

chapter 11<br />

Database Database configuration for evaluations,<br />

cf. section 10.1.3<br />

Analyzer Reports Production of report-ready evaluations of<br />

simulation runs, cf. section 11.24<br />

SIMULATION Simulation parameters and run control:<br />

Parameters Set simulation parameters, cf. section 8.1.1<br />

Continuous Run simulation continuous F5<br />

Single Step Run simulation one step further F6<br />

Stop Stop the simulation run ESC<br />

Multirun Set parameters and start Multirun<br />

simulation, cf. section 8.1.3<br />

Load Snapshot Load simulation snapshot file, cf. section<br />

8.1.2<br />

Save Snapshot Save current simulation state as snapshot<br />

38 <strong>VISSIM</strong> <strong>5.30</strong>-<strong>05</strong> © PTV AG 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!