24.08.2013 Views

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

11 Evaluation Types for Simulations of Vehicles<br />

► Selected Parameters (use and to add or remove a selected parameter)<br />

► Available parameters (Parameter Selection)<br />

► Vehicle Class (enabled only for some parameters)<br />

Use the buttons UP and DOWN to arrange the entries (columns in *.KNA data<br />

file).<br />

● Output: Select data type, e.g. as database table, if applicable:<br />

- Compiled data: Creates an ASCII file *.KNA according to the<br />

current settings in the window (parameters, vehicle classes etc.).<br />

If <strong>VISSIM</strong> is started with command line parameter -s or if the<br />

simulation run is started via COM with RunIndex set to a value >0,<br />

the index of the simulation run will be added to the name of the<br />

output file (*.KNA).<br />

- Raw data: Creates an ASCII file *.KNR, does not regard userdefined<br />

parameter settings.<br />

- Database: If active, evaluation output of compiled and/or raw data<br />

is directed to a database with the specified Table Name (rather than<br />

to an ASCII text file *.KNA and/or *.KNR). The table name must not<br />

be used for any other <strong>VISSIM</strong> database evaluations. In order to use<br />

the database output the database connection needs to be configured<br />

(cf. section 10.1.3).<br />

The selected parameters and other settings are saved to a node evaluation<br />

configuration file (*.KNK) when the window is closed via OK.<br />

Filter<br />

The evaluation can be<br />

switched on/off<br />

► separately for<br />

each node via the<br />

node attributes or<br />

► via the list of<br />

Active nodes in<br />

the Node<br />

Evaluation – Filter<br />

window.<br />

Furthermore, define<br />

the following parameters<br />

for delay measurements:<br />

► the upstream Start of delay segment position,<br />

► time period (From - Until) and<br />

► length of the time Interval of the evaluation.<br />

540 <strong>VISSIM</strong> <strong>5.30</strong>-<strong>05</strong> © PTV AG 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!