24.08.2013 Views

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Link Evaluation<br />

● The selected parameters (and vehicle classes) are displayed within the<br />

list box to the left (Layout of columns).<br />

● Parameters can be inserted and removed by using the buttons and<br />

- considering the choice of Vehicle Class for certain parameters. For a<br />

list of all parameters available see below.<br />

● from/until, Interval: A time period for the evaluation and the aggregation<br />

interval needs to be defined.<br />

● Per Lane: If active, data will be evaluated individually for every lane of<br />

multi-lane links. Otherwise the data will be aggregated for all lanes.<br />

● Database: If active, evaluation output is directed to a database to the<br />

specified Table Name (rather than to an ASCII text file). The table name<br />

must not be used for any other <strong>VISSIM</strong> database evaluations. In order to<br />

use the database output the database connection needs to be configured<br />

(cf. section 10.1.3).<br />

Results<br />

A link evaluation file (*.STR) contains:<br />

► File title<br />

► Path and name of the input file (File)<br />

► Simulation comment (Comment)<br />

► Date and time of the evaluation (Date)<br />

► Version no. with Service pack no. and Build no. (<strong>VISSIM</strong>)<br />

► List of all evaluated vehicle classes<br />

► List of selected parameters with brief description<br />

► Data block with a column for each selected parameter: See list below.<br />

<strong>User</strong> <strong>Manual</strong> © PTV AG 2011 535

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!