24.08.2013 Views

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Special Evaluations (Discharge rate evaluation)<br />

- The 2 nd column is the elapsed time between the start of the green<br />

time and the arrival of the first vehicle at the data collection point.<br />

- The 3 rd column is the time gap between both the front ends of vehicle<br />

#1 (vehicle at 1 st position in the queue) and vehicle #2. Thus it is the<br />

time vehicle #2 needs to clear its queue position which is the<br />

Discharge Rate of vehicle #2.<br />

- The following columns contain all subsequent Discharge Rates<br />

according to the vehicle positions.<br />

- Numbers in parenthesis show the number of vehicles passed during<br />

that green time and their average Discharge Rate (both not including<br />

the Discharge Rate of vehicle #1 because that time depends on the<br />

location of the data collection point).<br />

- Values after parenthesis are the Discharge Rates of vehicles<br />

crossing the stop line after the green time (during amber or even<br />

red).<br />

- The 4 th line from the bottom contains the index of the vehicle’s<br />

position in the queue for each signal cycle.<br />

- The 3 rd line from the bottom contains the average Discharge Rates<br />

for the corresponding vehicle position.<br />

- The 2 nd line from the bottom contains the number of all vehicles<br />

measured for that position (higher indices might have smaller<br />

numbers if the flow is not saturated at all times).<br />

- The bottom line shows the total number of vehicles and total<br />

Discharge Rate for the whole evaluation period.<br />

Example (*.A00 file)<br />

Discharge Rate Evaluation<br />

File: e:\programfiles\vissim520\example\manual.inp<br />

Comment: <strong>Manual</strong> example<br />

Date: T Wednesday, May 2, 2009, 15:43:02<br />

<strong>VISSIM</strong>: 5.20-00 [19061]<br />

Discharge at SC 10, signal group 4 (data collection point 10422)<br />

<strong>User</strong> <strong>Manual</strong> © PTV AG 2011 559

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!