24.08.2013 Views

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

VISSIM 5.30-05 User Manual

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

6 The Traffic Network<br />

Double-click an interstage to call the Interstage editing view for it. Click to<br />

return to Stage sequence editing.<br />

Click and move the separator between the two window sections to change<br />

the size of the two sections.<br />

6.7.4.6 Editing Signal Programs<br />

Signal programs have a name and a number and also a cycle time, an offset<br />

for synchronization (e.g. for progressive signal systems) and a switch point<br />

that allows for changing to another signal program at a certain instant, in a<br />

daily signal program list, for example.<br />

If an intergreen matrix has been assigned to a signal program, the<br />

compliance with the intergreens can be observed and retained during signal<br />

program editing. Intergreen violations will be highlighted automatically.<br />

316 <strong>VISSIM</strong> <strong>5.30</strong>-<strong>05</strong> © PTV AG 2011

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!