Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

Writeup AP 2011-12 - Punjab State Planning Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

An amount of Rs. 20.00 Crore as an ACA has been provided by the <strong>Planning</strong><br />

Commission during 2010-11. A token provision of Rs. 1.00 lac is provided for the Annual<br />

Plan <strong>2011</strong>-<strong>12</strong>.<br />

AH-25 Establishment and Strengthening of existing Hospitals and Dispensaries<br />

(75:25)<br />

106<br />

Outlay-Rs. 270.00 lac<br />

2.3.44 Presently, the Department of Animal Husbandry is extending Animal Health<br />

Care Service to livestock owners through 1367 Veterinary Hospitals (out of these 582 Vety.<br />

Hospitals have been transferred to Zila Parishads), 1485 Veterinary Dispensaries and 19<br />

Veterinary Polyclinics. These institutions are in dilapidated condition and need<br />

repair/renovation. On the basis of recommendation made by the National Commission on<br />

Agriculture in 1976, the GoI has implemented a new scheme ‘Establishment and<br />

Strengthening of Existing Veterinary Hospitals and Dispensaries’ on 75:25 sharing basis<br />

between GoI and the state government during 2010-11. Upgradation of 100 Veterinary<br />

Dispensaries, repair of 50 Veterinary Hospitals and construction of 21 Veterinary<br />

Dispensaries would be undertaken under this scheme.<br />

The scheme had been included with an outlay of Rs.133.33 lac as 25% state<br />

share in the Revised Estimates during 2010-11. An expenditure of Rs. 133.33 lac had been<br />

incurred during 2010-11. An outlay of Rs. 270.00 lac as 25% state share is provided for the<br />

Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

Centrally Sponsored Schemes (100%)<br />

CS(AH)-1 National Project on Rinderpest Eradication (100% CSS)<br />

Outlay -Rs. 40.00 lac<br />

2.3.45 The main objectives of the scheme are to strengthen the disease diagnostic<br />

capability of the state laboratories and to carry out the activities of National Project on<br />

Rinderpest Eradication in order to satisfy the OIE (Office International Epizootes)<br />

specification so as to keep the country free of rinderpest.<br />

2.3.46 An outlay of Rs.300.00 lac is provided for 11 th<br />

Five Year Plan. An<br />

expenditure of Rs.26.44 lac, Rs.17.86 lac and Rs. 5.96 lac was incurred during the year 2007-<br />

08, 2008-09 and 2009-10 respectively. Against an expenditure of Rs. 5.94 lac incurred<br />

during 2010-11. An outlay of Rs. 40.00 lac is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.