11.1.29 Under this scheme, preparatory activities like strengthening of offices at the<br />

state and district level, strengthening of manpower, organizing workshops and seminars etc.<br />

have been completed. 149 middle schools have been upgraded to high schools during 2009-<br />

10 and 2010-11. An expenditure of Rs. 3366.67 lac (Rs. 2525.00 lac as centre share + Rs.<br />

841.67 lac as state share and Rs. 17094.25 lac (Rs. 14094.25 lac as centre share + Rs.<br />

3000.00 lac as state share) was incurred during Annual Plan 2009-10 and 2010-11<br />

respectively. An outlay of Rs. <strong>12</strong>000.00 lac (Rs. 9000.00 lac as centre share + Rs. 3000.00<br />

lac as state share) is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

EDS-14 Construction and running of girls hostels for students of secondary &<br />

higher secondary schools (90:10)<br />

333<br />

Outlay – Rs. 29.97 lac<br />

11.1.30 Under this scheme, GoI has given the approval of construction of 21 girls<br />

hostels in educationally backward blocks in seven districts namely Bathinda, Ferozepur,<br />

Mansa, Sri Muktsar Sahib, Patiala, Sangrur and Tarn Taran during 2009-10. The total<br />

construction cost of a hostel fixed by GOI is Rs. 42.50 lac. 10% of the total cost is to be<br />

shared by the state. The escalation in costs is to be borne by the <strong>State</strong>. The running cost per<br />

hostel is Rs. 14.27 lac. The construction work is likely to be completed by <strong>2011</strong>-<strong>12</strong>. An<br />

expenditure of Rs. 446.67 lac (Rs. 402.00 lac as centre share + Rs. 44.67 lac as state share)<br />

and Rs. 350.00 lac (Rs. 315.00 lac as centre share + Rs. 35.00 lac as state share) was<br />

incurred in the Annual Plan 2009-10 and 2010-11 respectively. An outlay of Rs. 299.70 lac<br />

(Rs. 269.73 lac as centre share + Rs. 29.97 lac as state share) is provided for the Annual<br />

Plan <strong>2011</strong>-<strong>12</strong>.<br />

EDS-15 Setting up of model schools at block level in educationally backward<br />

blocks (75:25)<br />

Outlay – Rs. 393.75 lac<br />

11.1.31 The model schools have been constructed in 21 educationally backward<br />

blocks of 7 districts namely Bathinda, Ferozepur, Mansa, Sri Muktsar Sahib, Patiala, Sangrur<br />

& Tarn Taran. The cost per school is Rs 3.77 crore (Rs 3.02 crore non-recurring & Rs. 0.75<br />

crore recurring). These schools have been made functional. An expenditure of Rs. 3170.67<br />

lac (Rs. 2378.00 lac as centre share + Rs. 792.67 lac as state share) and Rs. 3667.00 lac<br />

(Rs. 2874.00 lac as centre share + Rs. 793.00 lac as state share) was incurred in the Annual<br />

Plan 2009-10 and 2010-11 respectively. An outlay of Rs. 1575.00 lac (Rs. 1181.25 lac as<br />

centre share + Rs. 393.75 lac as state share) is provided for the Annual Plan <strong>2011</strong>-<strong>12</strong>.