New Scheme<br />

<strong>State</strong> Funded Scheme<br />

RT-8 Replacement of old Buses<br />

Outlay - Rs. 1000.00 lac<br />

8.1.10 The total fleet strength of the department is 621 buses. Almost all of the buses<br />

have outlived their life and require immediate replacement. To replace 200 buses, an outlay<br />

of Rs. 1000.00 lac is provided in the Annual Plan <strong>2011</strong>-<strong>12</strong>.<br />

8.2 ROADS AND BRIDGES<br />

Outlay – Rs. 60701.00 lac<br />

8.2.1 Roads and communication network hold the key to the overall growth of<br />

economy. It is a basic infrastructure for promotion of agriculture, industry, trade and<br />

business. The <strong>Punjab</strong> has an extensive 60881 km network of roads comprising of 1749 km of<br />

national highways, 1479 km of state highways, 21<strong>12</strong> km major district roads, 4482 km of<br />

other district roads and 51059 km of village link roads. The state government plans to<br />

upgrade all the important link roads with more than 10 metre width into plan roads. The state<br />

government since 2002-03 to 2007-08 has rehabilitated important roads of 4280 km length at<br />

a cost of Rs. 901.00 crore. A total length of 1100 km village link roads at a cost of Rs. 430.00<br />

crore were also constructed in the 10 th Five Year Plan. Besides, a length of 2682 km new<br />

village link roads with an expenditure of Rs. 282.72 crore have been constructed during<br />

2007-08. As special repair of 1769 km of link roads has been completed with an expenditure<br />

of Rs. 165 crore in 2008-09. Besides, repair of 4052 km of roads with cost of Rs. 376 crore<br />

has been sanctioned/constructed during 2008-09. During 2008-09, 962 km of new roads has<br />

been constructed with the expenditure of Rs. 159 crore and the work on 184 km new link<br />

roads with the cost of Rs. 60.68 crore has been completed. During the year 2009-10, a length<br />

of 310.10 km of national highwyas was strengthened and upgraded at a cost of Rs. 183 crore.<br />

Besides, 4603 km of village link roads had been completed during the year 2009-10 at a total<br />

cost of Rs. 588.63 crores and 853.06 kms of new link roads were completed at a cost of Rs.<br />

94.70 crores. During the year 2009-10, a length of 1033 km of plan roads were completed at<br />

a cost of Rs. 639.41 crores. The state government is planning to upgrade important link<br />

roads which are falling within 5 km of district headquarters and sub divisional offices and<br />

also a proposal to convert link roads with metal led width of more than 10 ft into plan roads.<br />

211